PARKLAND / BROWARD COUNTY

A plan for your parcel.
Not just a style.

Bring the survey, easements, gate needs and community requirements together before choosing a Parkland fence layout.

Map the proposed fence and its connections.

Mark the fence run, gates, existing landscaping and recorded easements on the property information. Discuss where a new fence meets an existing structure or neighboring boundary.

Parkland’s published checklist asks for a fence-connection agreement when connecting to a neighbor’s property. Identify that situation early rather than assuming an adjoining fence is available for the connection.

Identify the approvals that actually apply.

The city checklist identifies North Springs Water District and HOA approval letters where applicable. It also calls for a fence/screen addendum when a pool is present. Review those questions for the actual parcel and project.

An association approval and a municipal permit are separate decisions. Gather the community’s current standards, and clarify who prepares and submits each required document. Our HOA review guide can help organize the conversation.

Ask about engineering review for easements.

Parkland’s checklist flags engineering requirements for the Ranches and Pinetree Estates. Its separate engineering packet addresses certain side drainage easements and restrictions involving rear drainage easements.

The published packet includes older forms. Confirm the current requirements with the city before assuming a fence is allowed within an easement or using an old fee, dimension or processing instruction. Keep the proposed line open to revision.

Plan the gates and safety functions.

Think through pedestrian access, equipment and vehicles, including how each gate opens and the room it needs. A wider entrance or powered operator changes the project scope beyond the fence panels.

Pool protection and any animal-containment needs require their own assessment. Ranch-rail appearance does not establish that a design is suitable for livestock. Explore gate planning and pool-barrier planning as relevant.

Choose the material after the layout.

Compare aluminum, vinyl and other catalog directions against the documented property requirements. The written proposal should identify materials, installation scope, approvals and inspection responsibilities.

Gate-only and repair work is reviewed separately. Review the city fence checklist and engineering packet, then discuss your property with the team.

THE NEXT STEP

Make the plan specific.

We’ll discuss the property and confirm the scope before you commit.

Contact the team →