Check whether a permit is needed
The City of Miami Beach publishes an interactive permit guide that helps determine whether a given fence type and scope needs a building permit. Use it, or ask the Building Department, before any work is scheduled.
Heights depend on the yard, and on the water
The City’s zoning regulations set different limits for front yards, side and rear yards, and yards that abut a waterway. See the supplementary yard regulations and confirm the numbers for your zoning district before choosing a design. On a bayfront or canal lot, the water side usually calls for a more open design than the street side.
Historic districts can add review
Properties in a historic district may need a Certificate of Appropriateness, and the City’s design guidelines can influence the style that is accepted. Ask the Planning Department whether your parcel is in a district before choosing a material or finish.
Salt air, wind and the specification
Miami-Dade County is in the High-Velocity Hurricane Zone, and a barrier-island location adds salt exposure that attacks fasteners, hinges and coatings. A good written proposal names the product, anchoring, hardware and finish, not just the height. Aluminum does not develop red rust like steel but can still corrode; follow the manufacturer’s finish and care instructions.


