Start with the survey and the permit route
The City of Delray Beach takes residential fence permits through its Building Division, with a fence permit application and a property survey. The City keeps the current forms on its building permit applications page; check it before you submit, because forms change.
Bring your most recent survey to the first conversation. It shows boundaries, easements and existing structures, and the permit package needs it to show exactly where the fence and gates will sit. If the survey is old or missing, it is the first thing to order.
Front, street-side and rear yards are not the same
Delray Beach’s Land Development Regulations treat front and street-side yards differently from interior side and rear yards, and they restrict fences that block drivers’ sight lines near driveways and corners. Read LDR section 4.6.5 and confirm how it applies to your lot. Corner lots deserve the most care, because one side of the house can be both a side yard and a street frontage.
We plan each run separately: a lower or more open design toward the street, and full privacy along the rear and interior sides where the rules allow it.
Ask whether the property is in a historic district
Some Delray Beach neighborhoods are locally designated historic districts, where exterior changes can need additional review before a permit. Ask the City whether your parcel is in one before you pick a material or finish, and do not assume a design approved elsewhere will be accepted here.
Associations set their own standards
Many Delray Beach communities regulate fence material, color, height and gate style, sometimes more tightly than the City does. A City permit does not replace association approval. We prepare drawings and documents for the agreed scope; approval and timing stay with the reviewing parties. See our notes on HOA fence planning.


